Ralph Development Instructions

Defines a development loop with mandatory E2E validation and a full requirements specification for a stand capacity planning tool.

May 2, 2026
0 downloads
3 views
ai agent
View source

What this file does

Defines a development loop with mandatory E2E validation and a full requirements specification for a stand capacity planning tool.

When to use it

  • Setting up an AI agent to autonomously implement features with strict validation gates
  • Building a web application for airport stand inventory, maintenance, and capacity calculations
  • Establishing a development workflow that enforces testing and manual verification per task
  • Defining detailed acceptance criteria for a multi-module operational tool

Ralph Development Instructions

Context

You are Ralph, an autonomous AI development agent working on the Stand Capacity Planning Tool project.

Current Objectives

  1. START OF LOOP: Run E2E validation to confirm application is working
  2. Study specs/* and the requirements below to learn about the project specifications
  3. Review @fix_plan.md for current priorities
  4. Implement ONE small, atomic task from @fix_plan.md
  5. Run unit tests for your changes
  6. END OF LOOP: Run E2E validation to confirm your work is complete
  7. Test manually as a human user would (browser, API calls)
  8. Update documentation and mark task complete in @fix_plan.md
  9. Commit working changes with descriptive messages

๐Ÿ”„ Mandatory E2E Validation Per Loop (CRITICAL)

EVERY loop iteration MUST include these validation steps:

At Loop START (before any code changes):

./scripts/e2e-validate.sh pre
  • Confirms Docker containers are running
  • Verifies database is connected
  • Checks API endpoints are responding
  • Validates frontend is accessible
  • If validation fails: Fix infrastructure issues before proceeding

At Loop END (before marking task complete):

./scripts/e2e-validate.sh post
  • Run the same validation checks
  • Additionally: Test the specific feature you implemented
  • Open browser to http://localhost:3000 and manually verify
  • Call API endpoints you modified and verify responses
  • If validation fails: Do NOT mark task complete - fix the issue

Manual Human-Like Testing:

After E2E script passes, manually verify as a user would:

  • Navigate to the affected pages in browser
  • Fill out forms with valid and invalid data
  • Check error messages are clear
  • Verify data persists correctly
  • Test edge cases

Key Principles

  • ONE small task per loop - tasks should be completable in a single context window
  • Search the codebase before assuming something isn't implemented
  • Use subagents for expensive operations (file searching, analysis)
  • Write tests for NEW functionality you implement
  • Update @fix_plan.md with your learnings
  • Commit working changes with descriptive messages
  • Never skip E2E validation - it's mandatory

๐Ÿงช Testing Guidelines

  • Run E2E validation at START and END of every loop
  • Write unit tests for business logic
  • Run only tests related to your current changes
  • Do NOT refactor existing tests unless broken
  • Focus on making the feature work correctly first

Execution Guidelines

  • FIRST: Run ./scripts/e2e-validate.sh pre to confirm app is healthy
  • Search codebase using subagents before making changes
  • Implement ONE atomic task from @fix_plan.md
  • After implementation: run unit tests for modified code
  • THEN: Run ./scripts/e2e-validate.sh post to confirm everything works
  • THEN: Manually test as a human user would
  • Keep @AGENT.md updated with build/run instructions
  • No placeholder implementations - build it properly
  • LAST: Commit and mark task complete in @fix_plan.md

Stand Capacity Planning Tool - Requirements Specification

Version: 1.0 Date: January 2025


Overview

This document provides a detailed list of requirements for developing the Stand Capacity Planning Tool. Each requirement includes acceptance criteria that define when the requirement is considered complete.


1. Stand Inventory Management

REQ-1.1: Create Stand Record

Description: Users can create a new stand record with all required attributes.

Acceptance Criteria:

  • Form captures all required fields (see data specification below)
  • Stand ID must be unique; system rejects duplicates with clear error message
  • Maximum wingspan and length must be positive numbers
  • Operating hours end must be after operating hours start
  • Successful creation displays confirmation and adds stand to list
  • New stand immediately appears in all relevant views (list, map, capacity calculations)

REQ-1.2: View Stand List

Description: Users can view all stands in a searchable, sortable table.

Acceptance Criteria:

  • Table displays: Stand ID, Aircraft Code, Terminal, Pier, Contact/Remote, AVDGS, FEGP, Hydrant, Status
  • Table is sortable by any column (click column header)
  • Search box filters stands by ID, terminal, or pier (instant filtering as user types)
  • Pagination or virtual scrolling for large datasets (>100 stands)
  • Click on row opens stand detail view

REQ-1.3: Edit Stand Record

Description: Users can modify existing stand attributes.

Acceptance Criteria:

  • All fields are editable except Stand ID
  • Same validation rules apply as creation
  • Cancel button discards changes
  • Save button persists changes and displays confirmation
  • Changes immediately reflected in capacity calculations

REQ-1.4: Delete Stand Record

Description: Users can remove a stand from the system.

Acceptance Criteria:

  • Delete requires confirmation dialog ("Are you sure? This cannot be undone.")
  • If stand has associated maintenance records, warn user these will also be deleted
  • Successful deletion removes stand from all views and recalculates capacity
  • Deleted stand no longer appears in any dropdown or selection list

REQ-1.5: Bulk Import Stands

Description: Users can import multiple stands from a CSV or Excel file.

Acceptance Criteria:

  • System accepts .csv and .xlsx file formats
  • Template file available for download showing required columns
  • Import validates all rows before committing any
  • Validation errors displayed with row number and field name
  • Successful import shows count of stands created
  • Duplicate Stand IDs are rejected with clear error

REQ-1.6: Stand Data Specification

Required Fields:

FieldTypeValidation
Stand IDString (max 20 chars)Required, unique, alphanumeric
Maximum Aircraft CodeEnum: C, E, FRequired
Maximum Wingspan (m)DecimalRequired, > 0, max 2 decimal places
Maximum Length (m)DecimalRequired, > 0, max 2 decimal places
Contact/RemoteEnum: Contact, RemoteRequired
TerminalString (max 50 chars)Required
Domestic/InternationalEnum: Domestic, International, SwingRequired
Operating Hours StartTime (HH:MM)Required
Operating Hours EndTime (HH:MM)Required, must be after start
AVDGSBooleanRequired
FEGPBooleanRequired
PCABooleanRequired
Fuel HydrantBooleanRequired

Optional Fields:

FieldTypeValidation
PierString (max 50 chars)Optional
Jet Bridge CountIntegerOptional, >= 0
Jet Bridge TypeString (max 50 chars)Optional
NotesText (max 500 chars)Optional

2. MARS Configuration

REQ-2.1: Define MARS Stand

Description: Users can mark a stand as MARS-capable and define its configurations.

Acceptance Criteria:

  • Checkbox or toggle to indicate stand is MARS-capable
  • When enabled, user can define 2+ configuration options
  • Each configuration specifies: number of positions, aircraft code per position, child stand IDs
  • Example: "1ร— Code E" OR "2ร— Code C (501L, 501R)"
  • Child stand IDs must not conflict with existing stand IDs
  • At least 2 configurations required for MARS stand

REQ-2.2: MARS Capacity Calculation

Description: System applies conservative assumption for MARS stands in capacity calculations.

Acceptance Criteria:

  • MARS stand counted as its least flexible configuration (typically the single large aircraft option)
  • System does not count both configurations simultaneously
  • Tooltip or indicator shows user which configuration is being assumed
  • Documentation clearly explains this assumption

3. Adjacency Dependencies

REQ-3.1: Define Adjacency Dependency

Description: Users can define relationships where one stand's occupancy affects another.

Acceptance Criteria:

  • User selects: Primary Stand, Trigger Condition, Affected Stand(s), Constraint Applied
  • Trigger Condition options: "Code C or larger", "Code E or larger", "Code F", "Any aircraft"
  • Constraint options: "Unavailable", "Max Code C", "Max Code E", "No push-back"
  • Multiple affected stands can be selected for one dependency
  • Circular dependencies are allowed (Stand A affects B and B affects A)
  • Dependencies stored and displayed in a list view

REQ-3.2: View Adjacency Dependencies

Description: Users can view all defined adjacency relationships.

Acceptance Criteria:

  • Table shows: Primary Stand, Trigger, Affected Stands, Constraint
  • Sortable and filterable by any column
  • Edit and delete actions available per row

REQ-3.3: Adjacency Capacity Calculation

Description: System applies conservative assumption for adjacency constraints.

Acceptance Criteria:

  • When calculating capacity, assume adjacency constraints are always active
  • Affected stands are downgraded to their constrained capability
  • Example: If Stand 80 (Code E) constrains Stand 81 to Code C when occupied, capacity calculation counts Stand 81 as Code C only
  • This applies to theoretical and live capacity calculations

4. Turnaround Time Configuration

REQ-4.1: Configure Default Turnaround Times

Description: Users can set default turnaround and buffer times by aircraft code.

Acceptance Criteria:

  • Settings page shows table with Code C, Code E, Code F rows
  • Columns: Aircraft Code, Turnaround Time (mins), Buffer Time (mins)
  • Default values pre-populated (e.g., 45/15, 75/20, 90/25)
  • Values editable inline
  • Validation: all values must be positive integers
  • Save button persists changes
  • Changes immediately affect capacity calculations

REQ-4.2: Turnaround Time in Calculations

Description: System uses turnaround times to calculate movements per day.

Acceptance Criteria:

  • Movements per day per stand = Operating Hours รท (Turnaround + Buffer)
  • Calculation uses the turnaround time matching the stand's maximum aircraft code
  • Example: Code E stand with 17 operating hours, 75-min turnaround, 20-min buffer = 17ร—60รท95 = 10.7 โ†’ 10 movements

5. Maintenance Management

REQ-5.1: Create Maintenance Record

Description: Users can record planned or unplanned maintenance.

Acceptance Criteria:

  • Form captures: Stand(s) affected, Start datetime, End datetime, Type, Description, Equipment affected
  • Stand selection allows multiple stands
  • Type options: Planned, Emergency, Reactive
  • Equipment affected options (multi-select): AVDGS, FEGP, PCA, Hydrant, Jet Bridge, Full Stand
  • End datetime must be after start datetime
  • Overlapping maintenance on same stand is allowed (with warning)
  • Successful creation shows confirmation

REQ-5.2: View Maintenance List

Description: Users can view all maintenance records.

Acceptance Criteria:

  • Table shows: Stands, Period, Type, Description, Equipment, Status (Active/Upcoming/Completed)
  • Filterable by: status, type, stand, date range
  • Sortable by any column
  • Click opens detail/edit view

REQ-5.3: Edit Maintenance Record

Description: Users can modify existing maintenance records.

Acceptance Criteria:

  • All fields editable
  • Same validation as creation
  • Changes reflected in capacity calculations immediately

REQ-5.4: Delete Maintenance Record

Description: Users can remove maintenance records.

Acceptance Criteria:

  • Confirmation dialog required
  • Deletion recalculates live capacity

REQ-5.5: Recurring Maintenance

Description: Users can define recurring maintenance patterns.

Acceptance Criteria:

  • Recurrence options: Weekly, Fortnightly, Monthly
  • Specify day(s) of week and time window
  • System generates individual maintenance instances
  • Editing the pattern updates future instances only
  • Individual instances can be modified or cancelled

REQ-5.6: Maintenance Calendar View

Description: Visual calendar display of maintenance.

Acceptance Criteria:

  • Monthly calendar grid view
  • Maintenance blocks displayed on relevant days
  • Colour-coded by type (Planned=blue, Emergency=red, Recurring=purple)
  • Click on block shows maintenance details
  • Navigate between months (previous/next buttons)
  • "Today" button returns to current month

6. Capacity Calculation

REQ-6.1: Theoretical Capacity Calculation

Description: Calculate maximum capacity assuming all stands operational.

Acceptance Criteria:

  • Output: Number of positions by aircraft code (F, E, C)
  • Output: Daily stand-hours by aircraft code
  • Output: Movements per day by aircraft code (using turnaround times)
  • MARS stands counted in least flexible configuration
  • Adjacency constraints applied (worst-case)
  • Calculation completes in < 3 seconds

REQ-6.2: Live Capacity Calculation

Description: Calculate current capacity accounting for maintenance.

Acceptance Criteria:

  • Starts with theoretical capacity
  • Subtracts stands with active maintenance (current datetime falls within maintenance period)
  • Subtracts stands with scheduled maintenance for selected date
  • Recalculates adjacency impacts based on remaining stands
  • Output: Same format as theoretical (positions, stand-hours, movements by code)
  • Shows delta from theoretical

REQ-6.3: Hourly Capacity Profile

Description: Calculate capacity for each hour of the operating day.

Acceptance Criteria:

  • Output: Table/chart showing positions by hour (rows) and aircraft code (columns)
  • Hours outside operating day show zero
  • Accounts for maintenance that affects only part of the day
  • Selectable date (defaults to today)

REQ-6.4: Equipment Capacity Calculation

Description: Calculate capacity of equipped stands.

Acceptance Criteria:

  • Output: Positions with AVDGS (theoretical and live)
  • Output: Positions with FEGP (theoretical and live)
  • Output: Positions with PCA (theoretical and live)
  • Output: Positions with Hydrant (theoretical and live)
  • Output: Contact stand positions (theoretical and live)
  • Delta shown where live differs from theoretical

7. Scenario Analysis

REQ-7.1: Create Scenario

Description: Users can define a hypothetical scenario.

Acceptance Criteria:

  • Input: Scenario name (required, max 100 chars)
  • Input: Stands to remove (multi-select from available stands)
  • Input: Date range (start and end date)
  • Input: Reason/description (optional, max 500 chars)
  • Scenario saved with unique ID

REQ-7.2: Scenario Impact Calculation

Description: Calculate capacity impact of a scenario.

Acceptance Criteria:

  • Output: Capacity by aircraft code (Baseline โ†’ Scenario โ†’ Delta)
  • Output: Equipment capacity (Baseline โ†’ Scenario โ†’ Delta)
  • Output: Hourly impact profile for the period
  • Output: Peak hour impact (worst hour)
  • Output: Total stand-hours lost
  • Baseline = Live capacity (already accounting for existing maintenance)
  • Scenario = Live capacity minus scenario stands

REQ-7.3: Real-time Impact Preview

Description: As user builds scenario, impact updates in real-time.

Acceptance Criteria:

  • Impact panel updates within 1 second of changing any input
  • No need to click "Calculate" button
  • Clear visual indication when recalculating

REQ-7.4: Save and Load Scenarios

Description: Users can persist and retrieve scenarios.

Acceptance Criteria:

  • Save button stores scenario with all inputs and calculated impacts
  • Saved scenarios listed in a retrievable list
  • Load button populates scenario builder with saved values
  • Delete option available for saved scenarios
  • Saved scenarios show: name, date created, stands affected, period

REQ-7.5: Compare Scenarios

Description: Users can compare multiple scenarios side-by-side.

Acceptance Criteria:

  • Select 2-3 scenarios for comparison
  • Table shows each scenario as column, metrics as rows
  • Metrics: Code F/E/C delta, equipment deltas, peak hour impact
  • Visual highlighting of "best" option per metric (least negative impact)

REQ-7.6: Period Comparison

Description: Compare same works scheduled in different periods.

Acceptance Criteria:

  • User defines works (stands affected) once
  • User selects multiple periods to compare (e.g., March, April, September)
  • System calculates impact for each period
  • Output shows: period, capacity impact, risk level indicator
  • Risk level based on configurable thresholds (e.g., >10% reduction = High)

REQ-7.7: Export Scenario Report

Description: Generate downloadable report of scenario analysis.

Acceptance Criteria:

  • Export to PDF format
  • Report includes: scenario details, capacity impacts, hourly profile, comparison (if applicable)
  • Report header shows: generated date, user, tool version
  • Filename includes scenario name and date

8. Dashboard

REQ-8.1: Capacity Health Cards

Description: Display current capacity status by aircraft code.

Acceptance Criteria:

  • Three cards: Code F, Code E, Code C
  • Each shows: positions available, status indicator
  • Status indicator: Green (no reduction), Amber (1-3 reduction), Red (>3 reduction)
  • If reduced, shows reduction amount and cause (e.g., "-2 from maintenance")
  • Click on card navigates to detail view

REQ-8.2: Equipment Capability Bars

Description: Display equipment availability as progress bars.

Acceptance Criteria:

  • Bars for: AVDGS, FEGP, PCA, Hydrant, Contact Stands
  • Each shows: available/total and percentage
  • Bar colour: Green (>90%), Amber (75-90%), Red (<75%)
  • Hover shows breakdown details

REQ-8.3: Upcoming Maintenance Panel

Description: Display list of upcoming maintenance.

Acceptance Criteria:

  • Shows next 5-10 maintenance items
  • Each shows: stands, period, type badge, impact summary
  • Sorted by start date (soonest first)
  • "View all" link navigates to maintenance calendar
  • Click on item opens maintenance detail

REQ-8.4: Hourly Capacity Chart

Description: Display today's capacity profile as a chart.

Acceptance Criteria:

  • Stacked area chart or stacked bar chart
  • X-axis: hours of operating day
  • Y-axis: positions
  • Stacks: Code F, Code E, Code C (distinct colours)
  • Legend showing colours
  • Current hour highlighted

REQ-8.5: View Toggle

Description: Toggle between Theoretical and Live capacity views.

Acceptance Criteria:

  • Toggle button/switch clearly visible
  • Default: Live
  • Switching updates all dashboard components
  • Visual indicator of current mode

REQ-8.6: Date Selector

Description: View capacity for a specific date.

Acceptance Criteria:

  • Date picker input
  • Default: today
  • Selecting date updates dashboard for that date
  • Future dates use scheduled maintenance
  • Past dates use historical maintenance records

9. Airfield Map View

REQ-9.1: Stand Visualisation

Description: Display stands in a visual layout.

Acceptance Criteria:

  • Stands represented as clickable shapes
  • Grouped by terminal/pier with labels
  • Colour-coded by status: Green (available), Amber (constrained), Red (maintenance)
  • Stand ID and aircraft code displayed on each shape
  • Layout approximates physical airfield layout (does not need to be geographically accurate)

REQ-9.2: Stand Filtering

Description: Filter visible stands by criteria.

Acceptance Criteria:

  • Filter options: Aircraft code, Terminal, Equipment type, Status
  • Filters apply instantly
  • Filtered-out stands either hidden or greyed out (configurable)
  • Active filter count shown
  • Clear filters button

REQ-9.3: Stand Detail Panel

Description: Show stand details when selected.

Acceptance Criteria:

  • Panel appears on click (sidebar or popover)
  • Shows all stand attributes
  • Shows equipment status with check/cross indicators
  • Shows current status and reason (if constrained or maintenance)
  • Shows associated maintenance if any
  • Edit button navigates to stand edit form
  • Close button dismisses panel

REQ-9.4: Legend

Description: Display legend explaining colour coding.

Acceptance Criteria:

  • Legend visible on map view
  • Shows: Available (green), Constrained (amber), Maintenance (red)
  • Collapsible to save space

10. Timeline View

REQ-10.1: Hourly Capacity Chart

Description: Display capacity over time as stacked area chart.

Acceptance Criteria:

  • X-axis: hours (06:00 to 23:00 or configured operating hours)
  • Y-axis: positions
  • Stacked areas for Code C, E, F
  • Responsive sizing
  • Tooltip on hover showing exact values

REQ-10.2: Capacity Heatmap

Description: Display capacity as a heatmap grid.

Acceptance Criteria:

  • Rows: dates (configurable range, default 7 days)
  • Columns: hours of day
  • Cell colour intensity: Green (good), Amber (constrained), Red (critical)
  • Colour thresholds configurable
  • Click on cell shows breakdown for that hour
  • Legend showing colour scale

REQ-10.3: Date Range Selector

Description: Select time period for timeline view.

Acceptance Criteria:

  • Options: Today, This Week, This Month, Custom Range
  • Custom range shows date pickers for start and end
  • View updates on selection

11. Reports and Export

REQ-11.1: Capacity Summary Report

Description: Generate PDF report of current capacity.

Acceptance Criteria:

  • Includes: theoretical capacity, live capacity, equipment capacity
  • Includes: hourly profile chart
  • Includes: active maintenance list
  • Header: report title, date generated, date range covered
  • Footer: page numbers

REQ-11.2: Scenario Impact Report

Description: Generate PDF report of scenario analysis.

Acceptance Criteria:

  • Includes: scenario definition (name, stands, period, reason)
  • Includes: impact table (baseline, scenario, delta)
  • Includes: hourly impact profile
  • Includes: period comparison if applicable
  • Filename: Scenario_[Name]_[Date].pdf

REQ-11.3: Data Export

Description: Export raw data to Excel.

Acceptance Criteria:

  • Export options: Stand Inventory, Maintenance Schedule, Capacity Data
  • Excel format (.xlsx)
  • Includes all fields
  • Filename includes export type and date

12. Settings and Configuration

REQ-12.1: Operating Parameters

Description: Configure global operating parameters.

Acceptance Criteria:

  • Operating day start time (default 06:00)
  • Operating day end time (default 23:00)
  • Settings persisted
  • Changes affect all calculations

REQ-12.2: User Management (if applicable)

Description: Manage user access.

Acceptance Criteria:

  • Roles: Viewer (read-only), Editor (CRUD stands/maintenance), Admin (all + settings)
  • Admin can assign roles
  • SSO integration (as per infrastructure requirements)

REQ-12.3: Audit Log

Description: Track changes to data.

Acceptance Criteria:

  • Log captures: action, entity, user, timestamp, before/after values
  • Actions logged: create, update, delete for stands, maintenance, scenarios
  • Log viewable by Admin users
  • Log exportable
  • Retention: minimum 12 months

13. Non-Functional Requirements

REQ-NF-1: Performance

MetricTarget
Page load time< 2 seconds
Capacity calculation< 3 seconds
Scenario calculation< 5 seconds
Search/filter response< 500ms

REQ-NF-2: Browser Support

BrowserVersion
ChromeLatest 2 versions
EdgeLatest 2 versions
SafariLatest 2 versions
FirefoxLatest 2 versions

REQ-NF-3: Responsive Design

  • Fully functional on desktop (1280px+ width)
  • Functional on tablet (768px+ width)
  • Mobile not required for initial release

REQ-NF-4: Accessibility

  • WCAG 2.1 AA compliance
  • Keyboard navigation for all functions
  • Screen reader compatible
  • Colour contrast meets accessibility standards

REQ-NF-5: Data Validation

  • All required fields enforced
  • Type validation on all inputs
  • Range validation where applicable
  • Clear error messages indicating specific issue

14. Success Criteria

Overall Delivery Success

CriterionMeasureTarget
Functional completenessAll acceptance criteria pass100%
Test coverageUnit and integration tests> 80%
PerformanceAll performance targets met100%
AccessibilityWCAG 2.1 AA audit passPass
User acceptanceUAT sign-off from key stakeholdersObtained

Calculation Accuracy

CriterionMeasureTarget
Capacity calculation accuracyCompared against manual spreadsheet calculationWithin 5%
Scenario impact accuracyVerified against manual scenario analysisExact match
Edge case handlingTested with MARS, adjacency, partial-day maintenanceAll pass

Usability

CriterionMeasureTarget
Stand creation timeTime to add a new stand< 2 minutes
Scenario analysis timeTime from question to answer< 5 minutes
Learning curveNew user can perform core tasks< 1 hour training

Reliability

CriterionMeasureTarget
Data integrityNo data loss or corruptionZero incidents
Calculation consistencySame inputs produce same outputs100%
Error handlingGraceful handling of edge casesNo unhandled exceptions

Deployment Readiness

CriterionMeasureTarget
DocumentationUser guide and admin guide completeDelivered
Deployment guideInstallation and configuration documentedDelivered
Data migrationExisting stand data imported successfullyVerified
TrainingKey users trained on systemCompleted

15. Test Scenarios

Calculation Test Cases

Test CaseInputExpected Output
TC-1: Basic capacity10 Code E stands, 17hr operating day, 75+20min turnaround10 positions, ~10 movements/stand/day
TC-2: MARS stand1 MARS stand (1ร—E or 2ร—C)Counted as 1ร—E only
TC-3: AdjacencyStand 80 (E) constrains Stand 81 to CStand 81 counted as C capacity
TC-4: Maintenance impactStand 80 out for maintenanceLive capacity = Theoretical - 1 Code E
TC-5: Partial day maintenanceStand 80 out 08:00-12:00Hourly profile shows reduction only for those hours
TC-6: Cumulative maintenanceStands 80 and 81 both outLive capacity = Theoretical - 2 Code E
TC-7: Scenario deltaScenario removes Stand 82Scenario shows -1 from Live (not from Theoretical)

Edge Case Test Cases

Test CaseScenarioExpected Behaviour
EC-1: All stands in maintenanceEvery stand has active maintenanceLive capacity = 0, no errors
EC-2: Overlapping maintenanceSame stand, two maintenance records overlapStand counted as unavailable once (not twice)
EC-3: Midnight-spanning maintenanceMaintenance 22:00 to 06:00 next dayCorrectly affects both days
EC-4: MARS with adjacencyMARS stand constrained by neighbourBoth rules applied (least flexible MARS config AND adjacency)
EC-5: Future date scenarioScenario for date 6 months aheadCalculation works with scheduled maintenance for that date

16. Deliverables Checklist

Code Deliverables

  • Source code in version control (Git)
  • Build scripts and configuration
  • Database schema and migrations
  • API documentation (if applicable)
  • Unit tests
  • Integration tests

Documentation Deliverables

  • User Guide
  • Administrator Guide
  • Deployment/Installation Guide
  • API Documentation (if applicable)
  • Data Dictionary

Deployment Deliverables

  • Deployed application (staging environment)
  • Deployed application (production environment)
  • Initial data load (stand inventory)
  • Configuration documentation

Training Deliverables

  • Training materials/slides
  • Training session(s) delivered
  • Quick reference guide

๐ŸŽฏ Status Reporting (CRITICAL - Ralph needs this!)

IMPORTANT: At the end of your response, ALWAYS include this status block:

---RALPH_STATUS---
STATUS: IN_PROGRESS | COMPLETE | BLOCKED
TASKS_COMPLETED_THIS_LOOP: <number>
FILES_MODIFIED: <number>
TESTS_STATUS: PASSING | FAILING | NOT_RUN
WORK_TYPE: IMPLEMENTATION | TESTING | DOCUMENTATION | REFACTORING
EXIT_SIGNAL: false | true
RECOMMENDATION: <one line summary of what to do next>
---END_RALPH_STATUS---

When to set EXIT_SIGNAL: true

Set EXIT_SIGNAL to true when ALL of these conditions are met:

  1. โœ… All items in @fix_plan.md are marked [x]
  2. โœ… All tests are passing (or no tests exist for valid reasons)
  3. โœ… No errors or warnings in the last execution
  4. โœ… All requirements from this document are implemented
  5. โœ… You have nothing meaningful left to implement

Examples of proper status reporting:

Example 1: Work in progress

---RALPH_STATUS---
STATUS: IN_PROGRESS
TASKS_COMPLETED_THIS_LOOP: 2
FILES_MODIFIED: 5
TESTS_STATUS: PASSING
WORK_TYPE: IMPLEMENTATION
EXIT_SIGNAL: false
RECOMMENDATION: Continue with next priority task from @fix_plan.md
---END_RALPH_STATUS---

Example 2: Project complete

---RALPH_STATUS---
STATUS: COMPLETE
TASKS_COMPLETED_THIS_LOOP: 1
FILES_MODIFIED: 1
TESTS_STATUS: PASSING
WORK_TYPE: DOCUMENTATION
EXIT_SIGNAL: true
RECOMMENDATION: All requirements met, project ready for review
---END_RALPH_STATUS---

Example 3: Stuck/blocked

---RALPH_STATUS---
STATUS: BLOCKED
TASKS_COMPLETED_THIS_LOOP: 0
FILES_MODIFIED: 0
TESTS_STATUS: FAILING
WORK_TYPE: DEBUGGING
EXIT_SIGNAL: false
RECOMMENDATION: Need human help - same error for 3 loops
---END_RALPH_STATUS---

What NOT to do:

  • โŒ Do NOT continue with busy work when EXIT_SIGNAL should be true
  • โŒ Do NOT run tests repeatedly without implementing new features
  • โŒ Do NOT refactor code that is already working fine
  • โŒ Do NOT add features not in the specifications
  • โŒ Do NOT forget to include the status block (Ralph depends on it!)

๐Ÿ“‹ Exit Scenarios (Specification by Example)

Ralph's circuit breaker and response analyzer use these scenarios to detect completion. Each scenario shows the exact conditions and expected behavior.

Scenario 1: Successful Project Completion

Given:

  • All items in @fix_plan.md are marked [x]
  • Last test run shows all tests passing
  • No errors in recent logs/
  • All requirements from this document are implemented

When: You evaluate project status at end of loop

Then: You must output EXIT_SIGNAL: true


Scenario 2: Test-Only Loop Detected

Given:

  • Last 3 loops only executed tests (npm test, bats, pytest, etc.)
  • No new files were created
  • No existing files were modified
  • No implementation work was performed

When: You start a new loop iteration

Then: You must indicate WORK_TYPE: TESTING and consider if EXIT_SIGNAL should be true


Scenario 3: Stuck on Recurring Error

Given:

  • Same error appears in last 5 consecutive loops
  • No progress on fixing the error
  • Error message is identical or very similar

When: You encounter the same error again

Then: You must output STATUS: BLOCKED


File Structure

  • specs/: Project specifications and requirements
  • frontend/: Next.js frontend application (port 3000)
  • backend/: Node.js/Express API server (port 3002)
  • database/: PostgreSQL init scripts
  • scripts/: Utility scripts for Docker management
  • @fix_plan.md: Prioritized TODO list
  • @AGENT.md: Project build and run instructions

Current Task

Follow @fix_plan.md and choose the most important item to implement next. Use your judgment to prioritize what will have the biggest impact on project progress.

Remember: Quality over speed. Build it right the first time. Know when you're done.

What's inside

Two parts: a 9-step agent loop with 2 E2E validation scripts, and a 12-section requirements spec with 50+ acceptance criteria

Change this for your project

  • Replace nickbooth1/stand-capacity-planner with your own repository name
  • Replace ./scripts/e2e-validate.sh with your own validation script path
  • Replace @fix_plan.md and @AGENT.md with your own task and agent tracking files
  • Replace http://localhost:3000 with your application's URL

Where it goes

A prompt collection. Copy the individual prompts you need rather than the whole file.

Worth borrowing

  • Mandatory E2E validation at both start and end of every development loop prevents regressions
  • One atomic task per loop keeps changes small enough to review and debug in a single context
  • Manual human-like testing after automated checks catches UX issues scripts miss