Geoskill: Powerline Vegetation Risk

Identify vegetation encroachment, rapid growth, and tree fall risks along powerline corridors. Generate prioritized inspection points. Use when screening vegetation near powerlines…

ruiduobao

@ruiduobao

Install

$ openclaw skills install @ruiduobao/geoskill-powerline-vegetation-risk

Powerline Vegetation Risk

Identifies high vegetation, rapid growth, and potential tree fall risks along powerline corridors. Outputs prioritized inspection points with evidence slices.

Trigger

Use when the user wants to:

  • Screen vegetation encroachment risk along powerline corridors
  • Assess tree fall hazards toward powerlines
  • Prioritize inspection routes based on vegetation risk
  • Generate evidence slices for maintenance planning
  • Evaluate clearance between vegetation and conductors
  • Identify fast-growing vegetation near lines

CLI Usage

# Basic analysis with default parameters (110kv, synthetic data)
python scripts/powerline_vegetation_risk.py --output-dir ./pvr-output

# 220kv line with custom conductor height
python scripts/powerline_vegetation_risk.py \
  --voltage 220kv \
  --conductor-height 14.0 \
  --output-dir ./pvr-output

# Without conductor height data (proximity risk only)
python scripts/powerline_vegetation_risk.py \
  --voltage 110kv \
  --no-conductor-data \
  --output-dir ./pvr-output

# Custom corridor width and fall factor
python scripts/powerline_vegetation_risk.py \
  --voltage 500kv \
  --corridor-width 60.0 \
  --fall-factor 1.2 \
  --output-dir ./pvr-output

# With custom risk scoring rules
python scripts/powerline_vegetation_risk.py \
  --voltage 110kv \
  --risk-rules references/risk_scoring.json \
  --output-dir ./pvr-output

Parameters

ParameterDefaultDescription
--voltage110kvVoltage level: 10kv, 35kv, 110kv, 220kv, 500kv, 1000kv
--conductor-heightfrom schemaConductor height above ground (meters)
--no-conductor-dataFalseFlag: no conductor height data available
--corridor-widthfrom schemaCustom corridor half-width (meters)
--fall-factor1.0Tree fall reach factor (1.0 = tree height = reach)
--risk-rulesbuilt-inCustom risk scoring rules JSON
--powerlinesNonePowerlines GeoJSON file (LineString)
--treesNoneTrees GeoJSON file (Point with height/growth_rate)
--output-dir./pvr-outputOutput directory

Output

FileDescription
risk_points.geojsonPoint features for each vegetation risk location
risk_segments.geojsonLine features for high-risk line segments
clearance.tifRaster map of vertical clearance (meters)
inspection_priority.csvRanked inspection segments with recommendations
request.jsonAnalysis request metadata
output-manifest.jsonOutput file inventory and risk summary
qa.jsonQuality assurance checks

Risk Level Codes

CodeNameDescriptionAction
4criticalImmediate riskDispatch crew within 24 hours
3highPriority riskSchedule inspection within 7 days
2mediumPlanned riskInclude in next scheduled patrol
1lowMonitorNote for next routine inspection
0minimalNo actionNo action needed

Risk Scoring Factors

Each tree/vegetation point is scored on 5 factors (total 0-50):

FactorMaxDescription
Height proximity10Vegetation height relative to conductor
Growth rate10Annual growth rate (m/year)
Fall risk10Tree fall reach vs. distance to line
Slope exposure8Terrain steepness toward line
Wind exposure6Storm/wind frequency factor

Key Algorithms

Clearance Analysis

Computes vertical clearance = conductor_height - vegetation_height. Without conductor data, outputs proximity risk only (no true clearance).

Fall Risk

A tree can fall toward the line if tree_height * fall_factor >= distance_to_line. This considers horizontal distance, not just corridor intersection.

Corridor Generation

Buffers the powerline by voltage-dependent half-width (e.g., 25m for 110kv, 50m for 500kv). Custom width overrides default.

Segment Analysis

Each line segment between towers is analyzed independently. Trees within reach distance are scored and the segment gets the maximum risk level.

Exit Codes

CodeMeaning
0Success
2Argument error
3Dependency missing
6Data validation failure
7Processing failure

Limitations

  • Without conductor height data, clearance values are estimates only
  • Optical imagery cannot reliably provide individual tree heights
  • Engineering safety conclusions require field verification
  • Sensitive line data is processed locally (not uploaded)
  • Fall factor is a simplification; actual fall direction depends on wind and tree species

References

  • GB/T 50545-2010: Code for design of 110kV~750kV overhead transmission line
  • DL/T 741-2010: Operating code for overhead transmission line
  • Common utility vegetation management practices (IEEE)

数据下载

本 skill 可自动从 Microsoft Planetary Computer 下载数据 (无需 API key):

python powerline_vegetation_risk.py --bbox 116,39,117,40 --date-range 2024-06-01,2024-06-30 --output-dir <tmp>
  • --bbox W,S,E,N: WGS-84 边界框 (西, 南, 东, 北)
  • --date-range START,END: 日期范围 (YYYY-MM-DD,YYYY-MM-DD)
  • --aoi-file <path.geojson>: 替代 --bbox 的 GeoJSON 多边形
  • --cache-dir <path>: 缓存目录 (默认 ~/.geoskill_cache)

当用户只给 --bbox + --date-range (没有 --image) 时,skill 自动下载数据。 当用户给 --image 时,走原文件路径 (向后兼容)。